Sign In | Join Free | My chinacomputerparts.com |
|
Brand Name : POTENTIAL / POTENCY
Model Number : KGJ312
Place of Origin : CHINA
Certification : ISO9001:2015
MOQ : 1 Unit
Price : Negotiable
Packaging Details : FR or Bulk Ship
Delivery Time : 45 working days
Payment Terms : T/T, L/C
Supply Ability : 120 units per year
Model : Arch Installation Robot KGJ312
Max.Operating Width : 20m
Booms No. : 3
Transportation Dimension (L X W X H) : 14000×3000×3450mm
Max.Operating Height : 12m
Dual Power : Diesel & Electric
Maximum Load-bearing Capacity of The Main Arm : 3000Kg
Maximum Load-bearing Capacity of The Auxiliary Arm : 1500Kg
3000Kg Maximum Load-bearing Capacity Arch Assembly Robot for Tunnel 14000×3000×3450mm Transportation Dimension
Based on the design requirements, the specified minimum excavation clearance section for the tunnel of the China Kyrgyzstan Uzbekistan Railway is 5 meters (width) * 6 meters (height). At present, the arch installation trolley available on the market is primarily utilized for arch operations in large and medium-sized tunnel sections, requiring a minimum operating range exceeding 6 meters (width) * 6 meters (height).
Considering this circumstance, we propose the development of two sets of arch trolley construction plans tailored for single-track tunnels like those found on the China Kyrgyzstan Uzbekistan Railway.
Structural Upgrade for China Kyrgyzstan Uzbekistan Railway Tunnel:
In order to align with the construction design specifications of the China Kyrgyzstan Uzbekistan railway tunnel, the boom structure of the KGJ312 trolley has been upgraded and transformed. This modification ensures that the trolley meets the specific requirements of the project. When utilizing the back arch function, it is imperative that the height of the secondary lining trolley remains at least 4.2 meters. This guarantee is essential to uphold the equipment's passability standards during operation.
Maximum Load-bearing Capacity of The Auxiliary Arm | 1500Kg |
Model | Arch Installation Robot KGJ312 |
Maximum Load-bearing Capacity of The Main Arm | 3000Kg |
Transportation Dimension (L X W X H) | 14000×3000×3450mm |
Max.Operating Height | 12m |
Dual Power | Diesel & Electric |
Max.Operating Width | 20m |
Booms No. | 3 |
The KGJ312 articulated arch installation trolley is suitable for vertical arch operations with a minimum section of 5 meters (width) * 5 meters (height). It can be utilized in the construction of tunnel arches in various sections like inclined shafts, flat guides, cross passages, and main tunnels of the China Kyrgyzstan Uzbekistan railway tunnel. However, it requires the transportation of three sections of multiple arch frames to the face beforehand.
After enhancements, the KGM12300 is capable of vertical arch operations with a minimum section of 5 meters (width) * 6 meters (height). Unit A's multiple arches can be transported independently, but the secondary lining trolley must have a minimum height of 4.2 meters.
Either of the above options can be chosen based on the actual conditions at the China Kyrgyzstan Uzbekistan railway tunnel site.
Friendly reminder: Considering the cross-sectional data of the tunnel, other construction equipment like wet spraying machines and drilling and anchoring integrated machines should also possess characteristics such as small size, flexible maneuverability, and adjustable boom deployment within the tunnel.
Our Product Technical Support team is available to assist you with any issues or questions you may have regarding the Arch Installation Trolley. Whether you need help with assembly, troubleshooting, or general product information, our team is here to provide you with expert assistance.
In addition to technical support, we also offer a range of services to ensure that your Arch Installation Trolley functions optimally. This includes maintenance services, repair services, and product upgrades to keep your trolley operating at its best.
Product Packaging:
The Arch Installation Trolley is securely packed in a sturdy cardboard box to ensure safe delivery. The product is wrapped in protective packaging materials to prevent any damage during transit.
Shipping:
Orders for the Arch Installation Trolley are processed and shipped within 1-2 business days. We offer standard and expedited shipping options to meet your delivery needs. Tracking information will be provided once your order has been shipped.
Q: What is the brand name of the Arch Installation Trolley product?
A: The brand name is POTENTIAL or POTENCY.
Q: What is the model number of the Arch Installation Trolley?
A: The model number is KGJ312.
Q: Where is the Arch Installation Trolley manufactured?
A: The trolley is manufactured in China.
Q: What certification does the Arch Installation Trolley have?
A: The trolley is certified with ISO9001:2015.
Q: What are the payment terms for purchasing the Arch Installation Trolley?
A: The payment terms accepted are T/T and L/C.
![]() |
3000Kg Load-Bearing Arch Assembly Robot for Tunnel Construction KGJ312 Images |